Space Only Submission


As a space only stand you must submit the below no later that the 11/08/25 to the Operations team at [email protected]

  • Full Scale drawing with Dimensions
  • Risk assessment
  • Method statement
  • Construction phase plan
  • Contractors Public liability insurance
  • Space only check list

Just a reminder that no walling or flooring is provided for space only stands. Pop-up banners are not accepted as a space only stand – these must be inside a shell scheme stand.

All space only stands need to build their dividing walls and can not use the back of the stand behind them.

 

More information and guidance can be foundĀ here.

 

Failure to submit the above documents will result in additional charges and delays to your stand build.